Outdoor comperssor-condensing units
Fields of application
- A solution for large facilities with large areas where fresh air supplied through air handling units needs to be cooled.
- Ensuring compliance with EU requirements, according to which each workplace must be provided with an inflow of fresh air with a volume of at least 25 m³/h.
Simple installation
- If the Haier outdoor unit is used in combination with an air handling unit, such a system - unlike a water system - does not require the installation of a cooling tower, boiler and gas lines, which simplifies the installation of the system and reduces its costs.
- Centralized control of the air handling unit, which is part of the general network, is carried out from the same central console that controls the Haier systems.